FieldBee PowerSteer Ready
Installation & Operation Manual
Steer-Ready Tractors (CAN-bus only)
Please refer to this manual prior to beginning the installation of the PowerSteer Ready system.
Document: FB-MAN-PSR-2026-01-EN Rev A
Date: 14 November 2025
Table of Contents
- INTRODUCTION
- LEGAL DISCLAIMER
- SAFETY INFORMATION
- INSTALLATION REQUIREMENTS
- KIT OVERVIEW
- INSTALLATION OVERVIEW
- INSTALL GPS ANTENNA MOUNTING PLATE
- INSTALL STEERING CONTROLLER
- INSTALL POWERTABLET MOUNTING BRACKET
- INSTALL POWERSTEER READY HARNESSES
- CONNECT CAN ADAPTER HARNESS
- POWER SUPPLY FOR POWERSTEER READY SYSTEM
- POST-INSTALLATION PROCEDURES
- TRACTOR-SPECIFIC CAN CONNECTION & STEERING ACTIVATION
- CREATE NEW VEHICLE
- CALIBRATION & FIRST DRIVE
- FINAL HARDWARE INSTALLATION CHECKLIST
- TROUBLESHOOTING
- TECHNICAL SPECIFICATIONS
- CONTACT INFORMATION
- VERSION HISTORY
INTRODUCTION
FieldBee PowerSteer Ready – the fastest way to get 2.5 cm autosteer without adding a steering wheel motor or changing your steering system.
The system connects directly to the tractor’s factory CAN-bus and controls the hydraulic steering valve.
Installation time: 20–30 minutes. No mechanical changes in the cab.
LEGAL DISCLAIMER
Note: Read and follow ALL instructions in this manual carefully before installing or operating the PowerSteer Ready system.
Note: Take careful note of the safety information on the next page and the additional safety messages provided throughout this manual.
The manufacturer disclaims any liability for damage or injury that results from failure to follow the instructions, cautions, and warnings set forth herein.
Please take special note of the following warnings:
- There is NO obstacle avoidance system. A human must always be present in the operator’s seat.
- The system does NOT control vehicle speed.
- Steering may move unpredictably during testing, calibration, or automatic steering. Clear the area of people and obstacles.
- Use of the system is NOT permitted on public roads. Power OFF completely before driving on roads.
SAFETY INFORMATION
Warning Alerts
- NEVER leave the operator’s seat with AutoSteer engaged.
- Verify the area is CLEAR of people and obstacles before startup, calibration, or use.
- The operator is responsible for safe driving at all times.
Caution Alerts
- Disconnect battery before any work.
- Route cables away from hot surfaces (>80°C) and moving parts.
- Ensure Kickout (manual override) is functioning before every use.
INSTALLATION REQUIREMENTS
Standard Tool Requirements
- 13 mm/17 mm socket wrench
- 4 mm hex key
- Level, tape measure, ladder
- Cable ties, degreaser
Vehicle Requirements
- Factory steer-ready tractor with CAN BUS based steering system
- Clear roof or bonnet area (≥ 80 cm from rear axle center)
- Steering system calibrated by dealer service. The vehicle’s factory integrated steering system needs to be enabled, and the steering components (valve, wheel angle sensor, etc) may need to be calibrated by a trained service technician. Contact your tractor dealership for more information
KIT OVERVIEW
| # | Item | Description | Part Number |
|---|---|---|---|
| 1 | Steering Controller | Integrated RTK GNSS + CAN control module | FB-ASB-TC-S-EU-0-0 |
| 2 | Plastic Mounting Plate | With double-sided tape | PWS.0164.0.00.03 |
| 3 | Main Harness | Power +10-pin +CAN port +PowerSwitch | PWS.0165.1.00.00-CAN |
| 4 | CAN Adapter Harness | Model-specific (supplied with kit) | PWS.0170.x.xx.xx |
| 5 | PowerSwitch | Rocker switch (bracket-mount) | PWS.0049.0.04.00 |
| 6 | PowerTablet + RAM Holder | Full-screen control (recommended) | FB-TKIT-111-00 |
Optional Accessories
| Accessory | Purpose | Part Number |
|---|---|---|
| RUT240 Wi-Fi Router | Stable NTRIP via 4G | FB-WIFI-LT-T-EU-10 |
| Power cable extension 2 m | Longer reach to battery | PWS.0166.0.00.00 |
| 3-Pin Power Connector | Quick-disconnect power plug | PWS.0050.0.03.00 |
| RTK Base Station | Local RTK correction | FB-L2-B-EU-PT0 |
| Control Switch Panel kit for Steer Ready | Remote engage and additional features | PWS.0270.1.00.02 |
INSTALLATION OVERVIEW
PowerSteer Ready Installation without Control Switch Panel:
PowerSteer Ready Installation with Control Switch Panel:
Total time: 20–30 minutes
Steps:
- Install GPS antenna mounting plate → 5 min
- Install Steering Controller → 3 min
- Mount PowerTablet → 5 min
- Route Main Harness → 4 min
- Connect CAN adapter → 5 min
- Connect power → 3 min
- Setup & calibration → 7 min
INSTALL GPS ANTENNA MOUNTING PLATE
Location: Roof or bonnet, ≥ 80 cm from rear axle center.
- Clean surface with degreaser.
- Use level – surface must be flat.
- Peel double-sided tape.
- Align “Front” arrow forward.
- Press firmly for 30 seconds.
INSTALL STEERING CONTROLLER {#install-steering-controller}
- Align Controller (power socket toward cabin).
- Lower and twist left until seated.
- Twist right until resistance – locked.
INSTALL POWERTABLET MOUNTING BRACKET
Step 1. Mount RAM Holder Base
- Choose position on armrest or bar.
- Secure with two U-bolts and four nuts.
Step 2. Assemble Tablet Docking Unit
- (Optional) Attach Metal Plate with Power Switch to back of Tablet Holder.
- Align Handle Ball with four screw holes.
- Secure with four Machine Screws and Nylock Nuts.
Step 3. Connect RAM Arm
- Install the RAM Mount Double U-Bolt Ball Base.
- Install the RAM Mount Arm.
- Attach the RAM Mount Arm to the previously installed ball base on the back of the Docking Station
- Adjust Arm position for a comfortable display view
Step 4. Install SIM Card
CRITICAL: Verify Internet access via SIM for stable NTRIP.
Step 5. Mount PowerTablet
Installing and Connecting the Powerteer Harnesses
When routing harnesses, route them clear of moving parts and sharp objects. Secure the harnesses with cable ties or clips to ensure they are not damaged.
Once the Steering Controller is installed, for connection details, see:
INSTALL POWERSTEER READY HARNESSES
- Locate existing grommet.
- Route Main Harness into cab.
- Connect 10-pin to Controller → lock ring.
- Mount PowerSwitch in reachable place.
CONNECT CAN ADAPTER HARNESS
See TRACTOR-SPECIFIC CAN CONNECTION & STEERING ACTIVATION for your tractor brand
- Plug vehicle-specific end into tractor CAN port.
- Plug other end into CAN port on Main Harness.
- Ensure both connectors are fully seated.
POWER SUPPLY FOR POWERSTEER READY SYSTEM
- Black/Blue → battery – (negative first).
- Red → battery +.
- Tighten terminals with 13mm socket.
- Secure cables away from heat/moving parts.
POST-INSTALLATION PROCEDURES
- Apply supplied warning label inside cab.
- Activate factory steering system (see TRACTOR-SPECIFIC).
- Proceed to software setup.
CREATE NEW VEHICLE
CALIBRATION & FIRST DRIVE
Follow the in-app wizard step-by-step. The entire process takes 5–7 minutes.
Step 1. Power Up the System
- Turn the PowerSwitch → ON.
- Verify:
- Green flashing light on the Steering Controller.
- PowerSwitch backlight ON.
Step 2. Connect to the Controller
- On the PowerTablet (or phone):
- Wi-Fi →
rtkwifi - Password:
12345678
- Wi-Fi →
- Open FieldBee Navigation app.
- The app will automatically detect the Controller.
Step 3. Software & Firmware Update (CRITICAL)
Never skip this step – outdated firmware is the #1 cause of issues.
-
Update the App
- Open Google Play Store → search FieldBee Navigation → Update.
-
Update Firmware
- Open FieldBee Toolbox app.
- Tap Update → install if available.
- After update: Power OFF → wait 10 sec → Power ON again.
Step 4. Connect Controller to Tractor (CAN Check)
- Tap Next in the wizard.
- The app will test CAN communication.
- You must see GREEN statuses:
- CAN Connected
- Steering Ready
If status is RED → re-check CAN adapter plug and factory activation (TRACTOR-SPECIFIC).
Step 5. Enter NTRIP Credentials
- Input your local RTK provider:
- Server
- Port
- Username
- Password
- Mountpoint
- Tap Test Connection → must show GREEN “Connected”.
No extra FieldBee fees for using your own NTRIP.
Step 6. Vehicle Measurements
Enter exact values – 2.5 cm accuracy depends on this.
| Measurement | How to measure | Typical value |
|---|---|---|
| Controller Height | Ground → center of Controller housing | 2.6–3.2 m |
| Antenna front offset | Rear axle center → center of Controller (forward = positive) | +0.8 … +2.2 m |
| Wheelbase | Center front axle → center rear axle | 2.8–3.3 m |
| Track width | Center-to-center of rear wheels | 1.5–2.0 m |
Tip: Use tape measure and level. Change any value later → repeat tilt calibration.
Step 7. Calibration
On Steer-Ready vehicles, the Wheel Angle Sensor and the Steering valve have to be calibrated by a Technician of the tractor's dealership, and for the FieldBee system, the only necessary calibration step is the Tilt calibration. Tilt calibration ensures accurate steering by compensating for any tilt in the controller. To perform the calibration, you will need approximately two minutes and a flat surface. Follow these steps:
- Mark the initial position of the wheels.
- Park the tractor on a flat surface and remain stationary for 15 seconds to allow the system to record the tilt data.
- Turn the tractor 180 degrees.
- Stop on the same flat surface and remain stationary for another 15 seconds to complete the calibration.
This process helps the system correct any tilt-related errors, improving steering accuracy on uneven terrain.
| Step 1 | Step 2 |
|---|---|
![]() |
![]() |
| Stop and Mark the Wheel position | Remain stationary for 15 seconds |
| Step 3 | Step 4 |
|---|---|
![]() |
![]() |
| Turn Tractor to 180 Dgeree | Remain stationary for another 15 seconds after turning Vehicle |
Step 8. Access the "Navigation app"
Step 9. First Drive
- Draw a straight AB line (min. 100 m).
- Engage AutoSteer at 8–12 km/h.
- Check pass-to-pass accuracy – must be ≤ 2.5 cm.
Congratulations! Your FieldBee PowerSteer Ready is fully operational.
Step 10. Kickout Test (MANDATORY)
- Drive slowly in open field.
- Engage AutoSteer.
-
Grab steering wheel hard and turn 10–15°.
→ System must disengage instantly (sound + icon off).
If Kickout fails → immediately stop, re-plug CAN adapter, check factory activation.
FINAL HARDWARE INSTALLATION CHECKLIST
- Controller locked & level
- CAN adapter fully seated
- Power connected (black first)
- Kickout working
- RTK (solid green)
- First 100 m perfect
TROUBLESHOOTING
| Issue | Solution |
|---|---|
| No power | Check 15 A fuse in red wire |
| No RTK | Check NTRIP/SIM data |
| Steering not responding | Verify CAN connection & factory activation |
| Kickout fails | Re-plug CAN adapter |
TECHNICAL SPECIFICATIONS
| Parameter | Value |
|---|---|
| Accuracy | 2.5 cm pass-to-pass |
| Speed range | 0.2 – 22 km/h |
| Protection | IP67 (Controller) |
| Supply | 9–32 V DC, 15 A max |
| Installation time | < 30 minutes |
CONTACT INFORMATION
FieldBee Support Team
WhatsApp: +380 50 224 8722
Email: support@fieldbee.com
Knowledge base: knowledge-base.fieldbee.com
VERSION HISTORY
| Date | Rev | Changes |
|---|---|---|
| 2025-11-13 | A | First dedicated PowerSteer Ready manual |
FieldBee PowerSteer Ready – 30 minutes. 2.5 cm. No motor. Just drive.
Need John Deere, CLAAS, Fendt, JCB or Case IH next? Just drop the docs — done in 5 minutes.










No comments to display
No comments to display