Skip to main content

FieldBee PowerSteer Ready

Installation & Operation Manual Steer-Ready Tractors (CAN-bus only)

Please refer to this manual prior to beginning the installation of the PowerSteer Ready system.

Document: FB-MAN-PSR-2026-01-EN Rev A
Date: 14 November 2025


Table of Contents


INTRODUCTION

FieldBee PowerSteer Ready – the fastest way to get 2.5 cm autosteer without adding a steering wheel motor or changing your steering system. The system connects directly to the tractor’s factory CAN-bus and controls the hydraulic steering valve.
Installation time: 20–30 minutes. No mechanical changes in the cab.


Note: Read and follow ALL instructions in this manual carefully before installing or operating the PowerSteer Ready system.
Note: Take careful note of the safety information on the next page and the additional safety messages provided throughout this manual.
The manufacturer disclaims any liability for damage or injury that results from failure to follow the instructions, cautions, and warnings set forth herein.

Please take special note of the following warnings:

  1. There is NO obstacle avoidance system. A human must always be present in the operator’s seat.
  2. The system does NOT control vehicle speed.
  3. Steering may move unpredictably during testing, calibration, or automatic steering. Clear the area of people and obstacles.
  4. Use of the system is NOT permitted on public roads. Power OFF completely before driving on roads.

SAFETY INFORMATION

Warning Alerts

  • NEVER leave the operator’s seat with AutoSteer engaged.
  • Verify the area is CLEAR of people and obstacles before startup, calibration, or use.
  • The operator is responsible for safe driving at all times.

Caution Alerts

  • Disconnect battery before any work.
  • Route cables away from hot surfaces (>80°C) and moving parts.
  • Ensure Kickout (manual override) is functioning before every use.

INSTALLATION REQUIREMENTS

Standard Tool Requirements

  • 13 mm/17 mm socket wrench
  • 4 mm hex key
  • Level, tape measure, ladder
  • Cable ties, degreaser

Vehicle Requirements

  • Factory steer-ready tractor with CAN BUS based steering system
  • Clear roof or bonnet area (≥ 80 cm from rear axle center)
  • Steering system calibrated by dealer service. The vehicle’s factory integrated steering system needs to be enabled, and the steering components (valve, wheel angle sensor, etc) may need to be calibrated by a trained service technician. Contact your tractor dealership for more information

KIT OVERVIEW

# Item Description Part Number
1 Steering Controller Integrated RTK GNSS + CAN control module FB-ASB-TC-S-EU-0-0
2 Plastic Mounting Plate With double-sided tape PWS.0164.0.00.03
3 Main Harness Power +10-pin +CAN port +PowerSwitch PWS.0165.1.00.00-CAN
4 CAN Adapter Harness Model-specific (supplied with kit) PWS.0170.x.xx.xx
5 PowerSwitch Rocker switch (bracket-mount) PWS.0049.0.04.00
6 PowerTablet + RAM Holder Full-screen control (recommended) FB-TKIT-111-00

Optional Accessories

Accessory Purpose Part Number
RUT240 Wi-Fi Router Stable NTRIP via 4G FB-WIFI-LT-T-EU-10
Power cable extension 2 m Longer reach to battery PWS.0166.0.00.00
3-Pin Power Connector Quick-disconnect power plug PWS.0050.0.03.00
RTK Base Station Local RTK correction FB-L2-B-EU-PT0
Control Switch Panel kit for Steer Ready Remote engage and additional features PWS.0270.1.00.02

INSTALLATION OVERVIEW

PowerSteer Ready Installation without Control Switch Panel:

PowerSteer Ready Installation with Control Switch Panel:

FB_PowerSteer Ready KIT_connection_schematics.jpg

Total time: 20–30 minutes
Steps:

  1. Install GPS antenna mounting plate → 5 min
  2. Install Steering Controller → 3 min
  3. Mount PowerTablet → 5 min
  4. Route Main Harness → 4 min
  5. Connect CAN adapter → 5 min
  6. Connect power → 3 min
  7. Setup & calibration → 7 min

INSTALL GPS ANTENNA MOUNTING PLATE

Location: Roof or bonnet, ≥ 80 cm from rear axle center.

  1. Clean surface with degreaser.
  2. Use level – surface must be flat.
  3. Peel double-sided tape.
  4. Align “Front” arrow forward.
  5. Press firmly for 30 seconds.


INSTALL STEERING CONTROLLER {#install-steering-controller}

  1. Align Controller (power socket toward cabin).
  2. Lower and twist left until seated.
  3. Twist right until resistance – locked.


INSTALL POWERTABLET MOUNTING BRACKET

Step 1. Mount RAM Holder Base

  1. Choose position on armrest or bar.
  2. Secure with two U-bolts and four nuts.

Step 2. Assemble Tablet Docking Unit

  1. (Optional) Attach Metal Plate with Power Switch to back of Tablet Holder.
  2. Align Handle Ball with four screw holes.
  3. Secure with four Machine Screws and Nylock Nuts.

Step 3. Connect RAM Arm

  1. Install the RAM Mount Double U-Bolt Ball Base.
  2. Install the RAM Mount Arm.
  3. Attach the RAM Mount Arm to the previously installed ball base on the back of the Docking Station
  4. Adjust Arm position for a comfortable display view

Step 4. Install SIM Card

CRITICAL: Verify Internet access via SIM for stable NTRIP.

Step 5. Mount PowerTablet


Installing and Connecting the Powerteer Harnesses

When routing harnesses, route them clear of moving parts and sharp objects. Secure the harnesses with cable ties or clips to ensure they are not damaged.

Once the Steering Controller is installed, for connection details, see:

INSTALL POWERSTEER READY HARNESSES

  1. Locate existing grommet.
  2. Route Main Harness into cab.
  3. Connect 10-pin to Controller → lock ring.
  4. Mount PowerSwitch in reachable place.

CONNECT CAN ADAPTER HARNESS

See TRACTOR-SPECIFIC CAN CONNECTION & STEERING ACTIVATION for your tractor brand

  1. Plug vehicle-specific end into tractor CAN port.
  2. Plug other end into CAN port on Main Harness.
  3. Ensure both connectors are fully seated.

POWER SUPPLY FOR POWERSTEER READY SYSTEM

  1. Black/Blue → battery – (negative first).
  2. Red → battery +.
  3. Tighten terminals with 13mm socket.
  4. Secure cables away from heat/moving parts.

POST-INSTALLATION PROCEDURES

  1. Apply supplied warning label inside cab.
  2. Activate factory steering system (see TRACTOR-SPECIFIC).
  3. Proceed to software setup.

CREATE NEW VEHICLE

  1. Open FieldBee Navigation app.
  2. Tap Menu → Vehicles → + New.
  3. Select Tractor → enter Make, Model, Year.
  4. App auto-fills geometry (editable).
  5. Save → proceed to Calibration.

CALIBRATION & FIRST DRIVE

Follow the in-app wizard step-by-step. The entire process takes 5–7 minutes.

Step 1. Power Up the System

  1. Turn the PowerSwitch → ON.
  2. Verify:
    • Green flashing light on the Steering Controller.
    • PowerSwitch backlight ON.

Step 2. Connect to the Controller

  1. On the PowerTablet (or phone):
    • Wi-Fi → rtkwifi
    • Password: 12345678
  2. Open FieldBee Navigation app.
  3. The app will automatically detect the Controller.

Step 3. Software & Firmware Update (CRITICAL)

Never skip this step – outdated firmware is the #1 cause of issues.

  1. Update the App
    • Open Google Play Store → search FieldBee Navigation → Update.
  2. Update Firmware
    • Open FieldBee Toolbox app.
    • Tap Update → install if available.
    • After update: Power OFF → wait 10 sec → Power ON again.

Step 4. Connect Controller to Tractor (CAN Check)

  1. Tap Next in the wizard.
  2. The app will test CAN communication.
  3. You must see GREEN statuses:
    • CAN Connected
    • Steering Ready

If status is RED → re-check CAN adapter plug and factory activation (TRACTOR-SPECIFIC).

Step 5. Enter NTRIP Credentials

  1. Input your local RTK provider:
    • Server
    • Port
    • Username
    • Password
    • Mountpoint
  2. Tap Test Connection → must show GREEN “Connected”.
    No extra FieldBee fees for using your own NTRIP.

Step 6. Vehicle Measurements

Enter exact values – 2.5 cm accuracy depends on this.

Measurement How to measure Typical value
Controller Height Ground → center of Controller housing 2.6–3.2 m
Antenna front offset Rear axle center → center of Controller (forward = positive) +0.8 … +2.2 m
Wheelbase Center front axle → center rear axle 2.8–3.3 m
Track width Center-to-center of rear wheels 1.5–2.0 m

Tip: Use tape measure and level. Change any value later → repeat tilt calibration.

Step 7. Calibration

On Steer-Ready vehicles, the Wheel Angle Sensor and the Steering valve have to be calibrated by a Technician of the tractor's dealership, and for the FieldBee system, the only necessary calibration step is the Tilt calibration. Tilt calibration ensures accurate steering by compensating for any tilt in the controller. To perform the calibration, you will need approximately two minutes and a flat surface. Follow these steps:

  1. Mark the initial position of the wheels.
  2. Park the tractor on a flat surface and remain stationary for 15 seconds to allow the system to record the tilt data.
  3. Turn the tractor 180 degrees.
  4. Stop on the same flat surface and remain stationary for another 15 seconds to complete the calibration.

This process helps the system correct any tilt-related errors, improving steering accuracy on uneven terrain.

Step 1 Step 2
Tilt Calibration step 1.jpg Media (11).jpg
Stop and Mark the Wheel position Remain stationary for 15 seconds
Step 3 Step 4
Tilt Calibration step 3.jpg Tilt Calibration step 4.jpg
Turn Tractor to 180 Dgeree Remain stationary for another 15 seconds after turning Vehicle

Step 8. Access the "Navigation app"

Click the button to open the application, where you can create your first task and establish your initial guidance line.

Step 9. First Drive

  1. Draw a straight AB line (min. 100 m).
  2. Engage AutoSteer at 8–12 km/h.
  3. Check pass-to-pass accuracy – must be ≤ 2.5 cm.
    Congratulations! Your FieldBee PowerSteer Ready is fully operational.

Step 10. Kickout Test (MANDATORY)

  1. Drive slowly in open field.
  2. Engage AutoSteer.
  3. Grab steering wheel hard and turn 10–15°.
    → System must disengage instantly (sound + icon off).

If Kickout fails → immediately stop, re-plug CAN adapter, check factory activation.


FINAL HARDWARE INSTALLATION CHECKLIST

  • Controller locked & level
  • CAN adapter fully seated
  • Power connected (black first)
  • Kickout working
  • RTK (solid green)
  • First 100 m perfect

TROUBLESHOOTING

Issue Solution
No power Check 15 A fuse in red wire
No RTK Check NTRIP/SIM data
Steering not responding Verify CAN connection & factory activation
Kickout fails Re-plug CAN adapter

TECHNICAL SPECIFICATIONS

Parameter Value
Accuracy 2.5 cm pass-to-pass
Speed range 0.2 – 22 km/h
Protection IP67 (Controller)
Supply 9–32 V DC, 15 A max
Installation time < 30 minutes

CONTACT INFORMATION

FieldBee Support Team
WhatsApp: +380 50 224 8722
Email: support@fieldbee.com
Knowledge base: knowledge-base.fieldbee.com


VERSION HISTORY

Date Rev Changes
2025-11-13 A First dedicated PowerSteer Ready manual

FieldBee PowerSteer Ready – 30 minutes. 2.5 cm. No motor. Just drive.


Need John Deere, CLAAS, Fendt, JCB or Case IH next? Just drop the docs — done in 5 minutes.